04-15-2016, 07:44 AM
there is a post here somewhere here, that did this
and IIRC was off to the left, by 4 inches and needed to be cut 2 times, ugly
so measure care and go bigger on the cut,
say 12" square cut hole with saws all and metal cutting piranha blades
the weld a top rim to the new led, say 2 inch flat 20 gage metal, and then screw it back down. use the cut core as a new lid.
with the right trim of inside body removed, the L/R measurement can be exact, as seen in my red photo
making only F/R measure the hard one.
that is where id drill a hole upfront and use it as reference point for the next measurements.
and IIRC was off to the left, by 4 inches and needed to be cut 2 times, ugly
so measure care and go bigger on the cut,
say 12" square cut hole with saws all and metal cutting piranha blades
the weld a top rim to the new led, say 2 inch flat 20 gage metal, and then screw it back down. use the cut core as a new lid.
with the right trim of inside body removed, the L/R measurement can be exact, as seen in my red photo
making only F/R measure the hard one.
that is where id drill a hole upfront and use it as reference point for the next measurements.
http://www.fixkick.com