there are more pre96 transfer cases, in the wild. (suzuki sales dropped like a rock after the Consumt'n Reports, mag article.
its easy to find this out, just look at P/N of the 95 box. to 96.
only 10 parts touch that shaft.
only 2 wont fit. the speed driver gear will not fit. and the chain drive hub is 16 splines.
all other parts fit all 8 fit.
and have same partnumber. including all bearings and gears. and drive hubs.
and one bush. and seal.
how much wear is on that shaft?, only eyes and feel can tell
a new shaft has pn
1995 of>>>>> 29141-60a00 at $115
http://www.lehmansuzukipartsonline.com/p...eid=216897
btw, 2
Suzuki changed, drive chain, and both hubs, mid year 96.
its easy to find this out, just look at P/N of the 95 box. to 96.
only 10 parts touch that shaft.
only 2 wont fit. the speed driver gear will not fit. and the chain drive hub is 16 splines.
all other parts fit all 8 fit.
and have same partnumber. including all bearings and gears. and drive hubs.
and one bush. and seal.
how much wear is on that shaft?, only eyes and feel can tell
a new shaft has pn
1995 of>>>>> 29141-60a00 at $115
http://www.lehmansuzukipartsonline.com/p...eid=216897
btw, 2
Suzuki changed, drive chain, and both hubs, mid year 96.
http://www.fixkick.com