Ok some pics for yall. You can see I had to weld the "cups" onto the axles in the back. The top is a 5 inch round tube welded onto a plate that mounts to the bags. Then run airlines into the top to screw into the bag.
The first pic is of the front with the springs removed. You have to cut off the Bump stop pillar to get room for the upper front bag mount. those pics are coming.
The kit came with the round bar and the plates separate so you have to weld the plates and then I had to weld flat bar on top so the rubber mount on the top would not move around. Then welded a piece of flat bar to run a bold through to hold the top mount in place. Welded a bolt on the inside of the round bar to screw the bolt into. This way you can remove the whole top mount to get access to the screws to mount the bag tot he top if you ever had to replace the bag. You have to attach the airline before you put it up into the cavity.
Pictures of the front and inside the cap etc will be coming.
The first pic is of the front with the springs removed. You have to cut off the Bump stop pillar to get room for the upper front bag mount. those pics are coming.
The kit came with the round bar and the plates separate so you have to weld the plates and then I had to weld flat bar on top so the rubber mount on the top would not move around. Then welded a piece of flat bar to run a bold through to hold the top mount in place. Welded a bolt on the inside of the round bar to screw the bolt into. This way you can remove the whole top mount to get access to the screws to mount the bag tot he top if you ever had to replace the bag. You have to attach the airline before you put it up into the cavity.
Pictures of the front and inside the cap etc will be coming.